Verified Credential Download PDF

What Aditya demonstrated

Built an end-to-end warehouse fleet coordination prototype for Black Friday surge conditions. The work framed the bottleneck correctly as aisle congestion and dock contention, implemented admissible A* plus a centralized reservation-table cooperative planner with vertex and edge safety, and validated a realistic policy stack for charging and idle placement. The final recommendation was grounded in simulator evidence showing zero collisions and sustained throughput under the chosen policy.

  • Leakage-Free Feature Engineering
  • Honest Model Evaluation
  • Centralized Multi-Agent Coordination
  • Executive Decision Framing

Earn your own

Prove your skills on a real project

Pick a real company brief, complete it step by step, and walk away with a verified certificate like this one, graded by AI, shareable anywhere.

Start your own project →
Verified by ProoV · d7d94ed818e8d622